Client: ACUITY Environmental Solutions, LLC 

Location: Nogales, Arizona 

  • 330 ft of pipe 
  • 150 gpm system capacity 

Project Overview: 

ACUITY Environmental Solutions is providing groundwater remediation services and subcontracted Riley to assist with engineering design of a new groundwater extraction well and pumping system. Riley designed the pump and piping system (civil, mechanical, and electrical) to extract the groundwater and pipe water into the existing treatment system. The new groundwater well serves as an addition to an existing system of remediation wells. The additional groundwater well serves as an upgrade to the existing remediation system, increasing the output of treated groundwater. Riley assisted with the pump selection, pipe sizing, and appurtenance selection to safely convey the flow to the existing equalization tank.